As an owner, you need to know important points to be noted in RCC Sump Construction. Your responsibilities are not over after signing the agreement with builders. You need to ensure all the works are progressing in exact flow. You can choose Mohankumar Constructions to avoid these situations.
Simple Process of RCC Sump:
- Excavation
- Brick Work
- Bar bending
- Shuttering
- Concrete filing
- Curing
- Dismantle
- Plastering
- Top close
- Excavate the earth.
RCC sump should be 1 or ½ feet height than the ground level, more than 1 foot should be avoided.
Check the depth of the excavation. Ensure that it does not disturb any footings. In case if it touches it should be placed on top of the ramp.
If you are going for RCC walls. Do brickwork of 3 inches on all the four sides of the footing, bar bending and shuttering work should be done. Then pour concrete into it.
Important points to be noted:
- Ensure that any waterproofing chemicals are mixed with the solids. If not, it may cause leakage in the future.
Our construction cost is 1800 Rs/sqft
Don’t hesitate to contact our team. Our team receives special training to ensure that you get all the answers from us you. Get a free consultation from our team.
Related FAQ’s & Comments